From tender to last switch plate. Architect-led supervision, weekly site walks, daily WhatsApp logs, mock-ups on every finish.
WhatsApp the studio · +91 84334 28590 →We do not subcontract turnkey to a generic builder and disappear. The Business Head, Mr. Hitesh Sharma, runs the build the way a seasoned project manager runs a slab pour — timeline by timeline, vendor by vendor, drawing by drawing. The senior designer walks the site at every milestone. The drawings the contractor is building from are the same drawings the architect signed — no value engineering downstream by an unsupervised foreman.
Weekly site-progress videos delivered to the buyer on WhatsApp. Four scheduled buyer visits at the high-leverage milestones: foundation complete, slab complete, finishing start, handover. The full NCR-buyer playbook is here.
38 to 50 weeks for flatland Sahastradhara/Vikas Nagar. 52 to 72 weeks for a hill site (Mussoorie / Bhimtal / Mukteshwar) because the monsoon costs 8 to 10 weeks of productive site time.
2 to 3 percent of build cost or a flat fee depending on plot distance from the studio. Included in full-service architecture engagements.
Selectively, when the architecture set is from another studio of known quality. We do not turnkey unstamped or incomplete sets.
Dehradun + Doon valley + Garhwal + Kumaon + Delhi NCR. Each location has its own page.