Architect-of-record submission for MDDA, MDA, MCD and RERA Uttarakhand. Eight-to-twelve week clean approval cycle for residential. RERA-ready set in parallel for builders.
WhatsApp the studio · +91 84334 28590 →For a residential plot inside Mussoorie Dehradun Development Authority limits we file: (1) the site plan with setbacks, ground coverage and FAR calculations, (2) the proposed building plan with all floors and the terrace, (3) the structural certificate signed by a registered structural engineer, and (4) the architect-of-record undertaking. We file in your name — you do not have to walk into the MDDA office. Full process and timeline detailed in our MDDA approval roadmap.
All four clean — expect 8 to 12 weeks. Even one unclean — expect 3 to 6 months of re-submission.
Multi-unit residential or commercial above the RERA threshold requires registration. We prepare the RERA-ready set in parallel with the MDDA submission — drawings, structural certificate, project schedule, FAR & parking summaries — so the regulator portal accepts the bundle without re-stamping. Full RERA Uttarakhand guide here.
Four RERA-approved blueprints from the studio archive are in the homepage design library. They show what a complete set looks like — 2D plans, all elevations, section A-A, structural notes.
8 to 12 weeks for a clean residential plan inside MDDA limits. Longer for commercial, hospitality, multi-unit. Commercial brings fire NOC and pollution NOC into the cycle.
Yes. Same process, slightly different document set per the local authority bye-laws.
Plan-release fee, scrutiny charges, labour cess, water and sewage connection together run INR 1.2 to 2.8 lakh for a 4,000 sq ft villa depending on plot category. Our architect fee for MDDA work is included in the full-service design fee (6 to 9 percent of build cost).
Dehradun + Doon valley + Garhwal + Kumaon + Delhi NCR. Each location has its own page.
For mdda & rera approvals, the first conversation is free. Mrs. Tulika Sharma replies within a working day. The first site visit and feasibility note are on us.