Before signing an architect contract in Dehradun, ten questions surface what the marketing copy hides. Who will actually draw your plan, is that person registered with the Council of Architecture, will the structural set reference BIS 2025 explicitly, who files the MDDA submission, what is in the fee and what is not, will the architect personally be on site, what is the dispute path if you disagree on a substitution, who owns the drawings after handover, who carries the professional-indemnity insurance, and what happens when the project goes over budget. These ten do not feel adversarial when asked carefully, but they reveal the difference between a studio that runs its projects properly and one that is selling the brochure version of what a project will be like.
Here is what each question is really asking, why it matters, and what the honest answer should sound like.
Question one — Who in the studio will actually draw my plan and walk my site?
This is the first and most diagnostic question. In a small principal-led studio — ours, for instance — the answer is unambiguous. Mrs. Tulika Sharma draws the plan and walks the site. In a larger studio with twelve or twenty staff the answer is murkier. The principal architect appears in the marketing material and at the kick-off meeting, but the project is handed off to a project architect who is two or three years out of school, and the principal reviews the drawings at major milestones and walks the site once a quarter. Neither arrangement is wrong. They produce different buildings at different price points, and the buyer should know which arrangement applies to their commission before signing.
An honest answer to this question sounds like: "Mrs. Sharma is the principal-in-charge. She will personally do the concept, the schematic design, and the design development. The detailed drawings will be developed by her with a draftsman; she reviews and stamps each. She will walk the site at four scheduled milestones and additionally as required. The Business Head, Mr. Hitesh Sharma, will be on site weekly during construction and is the day-to-day project lead." That is specific, falsifiable, and contractually committable. An answer that says "our team will deliver excellence" is not an answer.
Question two — Is the architect registered with the Council of Architecture?
The Council of Architecture is the statutory body that registers practising architects in India. Only a COA-registered architect can sign and stamp building drawings legally; the title "architect" itself is statutorily restricted. A "designer," "interior designer," "plan designer," or "draftsman" can do legitimate work but cannot stamp drawings for MDDA submission as the architect-of-record. If the person you are hiring as your architect is not COA-registered, the MDDA filing has to be done in someone else's name, and the on-record accountability for the design is not theirs.
This is a five-minute check. Ask for the COA registration number. Verify it on the COA website. The check prevents a substantive class of problems, the most common of which is the discovery, three months into the project, that the architect cannot actually file the MDDA plan in their own name and has to subcontract the filing to a registered architect they do not have a working relationship with.
Question three — Will the structural set reference BIS 2025 (IS 1893:2025 and IS 13920) explicitly?
The IS 1893 Part 1 of 2025 amendment is the current applicable seismic code for residential structural design in Uttarakhand. A structural set issued in 2026 that does not reference IS 1893:2025 on its title block is designed to the superseded 2016 code. The building is being designed to a five-year-old standard, and the buyer is paying for a building that was code-compliant five years ago.
The honest answer is yes, with the structural engineer's name and registration number visible. The structural engineer should be able to explain what changed under the 2025 code if asked. The drawings should reference IS 1893:2025 and IS 13920 on the title block of every structural drawing. Our column-beam-footing blog covers what the new code actually requires.
Question four — Who handles the MDDA submission and who is the architect-of-record?
The MDDA submission is filed in the name of a registered architect-of-record. That architect carries the regulatory accountability for the design submitted. If the architect filing the submission is different from the architect designing the building, the design accountability and the regulatory accountability are split between two people, and the buyer is the only person who can hold both to account.
The honest answer is that the same architect designs and files. The MDDA portal account, the architect-of-record signature, and the design ownership all sit with one named individual. If the studio is small enough that this is one person, the answer is clean. If the studio is large enough that it has multiple registered architects, the buyer should still get a named architect-of-record at the start of the engagement, not after.
Question five — What does the fee include and what does it not?
The published architecture fee in Dehradun is typically a percentage of build cost — 6 to 9 percent for full-service, less for partial scopes. The percentage rate is easy to compare across architects. What it includes is harder to compare. The full-service scope usually covers concept, schematic design, design development, structural and MEP, joinery details, BOQ, tender preparation, and supervision. It usually excludes plot survey, soil testing, MDDA statutory fees, RERA filing fees, and any rework caused by client-initiated changes after a stage sign-off.
The buyer should ask for the inclusion-exclusion list in writing before signing. They should ask specifically about: revisions allowed after each stage sign-off, supervision frequency and travel costs, lighting design (in or out), landscape design (in or out), and how the BOQ is generated and updated through the project. A studio that has thought through its scope produces this list quickly; a studio that has not produces vague answers that get expensive at month six.
Question six — Will the architect personally be on site and how often?
The architect's site supervision is what catches contractor improvisation before the wall closes over it. Weekly is the standard for residential work in Dehradun; fortnightly is the practical floor; monthly is too sparse for anything more complex than a single-storey rebuild. The question to ask is who walks the site, how often, what the walk-down protocol is, and what the snag-list-resolution timeline is when something is wrong.
The honest answer commits to a frequency and a person. "The senior designer walks the site at four scheduled milestones; the project architect walks it weekly; the contractor receives a written snag list within twenty-four hours of every walk and has seven days to close." That is auditable. An answer that says "we provide comprehensive site supervision" is not.
Question seven — What is the dispute path if we disagree on a substitution mid-build?
This question gets asked too late. The buyer signs the contract, the build starts, the contractor proposes a material substitution at month seven, the architect accepts it, the buyer disagrees, and there is no defined path to resolve the disagreement. The honest answer at the start is that material substitutions require written buyer approval, communicated through the architect, before the substituted material is procured. The architect cannot accept a substitution unilaterally. If the buyer rejects a substitution the contractor is proposing, the contractor has to source the originally specified material or take a defined cost variation.
This sounds bureaucratic on paper and prevents the single largest class of buyer-architect-contractor conflicts in practice. The studio that has a written substitution protocol has thought about this; the studio that hand-waves it has not.
Question eight — Who owns the drawings after the project is complete?
Under conventional Indian architectural practice, the architect retains the copyright in the drawings and licenses the buyer to use them for the specific project on which they were commissioned. The buyer cannot legally reuse the drawings for a different project or sell them. The architect cannot use the drawings on a different project for a different client. Both restrictions matter; both should be explicit in the contract.
The version of this question that gets clients in trouble is when they want to use the drawings later — for a relative's similar house on an adjacent plot, for a re-build after damage, for a sale of the property where the buyer wants the as-built record. The architect's licence usually permits the first and the third; the second (relative's similar house) usually requires a separate licence and a separate fee. The honest contract is explicit about this; an evasive contract creates a fight five years later.
Question nine — Who carries the professional-indemnity insurance?
Professional-indemnity insurance covers the architect against claims arising from design errors. The premium is modest — a small percentage of fee — and a well-run studio carries it as standard. The buyer cannot make a claim on the insurance directly, but its presence indicates that the studio is operating as a professional practice rather than a freelance arrangement.
This question rarely gets asked because most buyers do not know it is relevant. The honest answer is yes, with the insurer named. A studio without professional-indemnity insurance is operating without the safety net the profession in the rest of the world considers basic.
Question ten — What happens when the project goes over budget?
It will. Residential construction in Dehradun routinely exceeds original budgets by 8 to 18 percent, more on complex hill projects, more again where the buyer changes specifications mid-build. The conversation to have at the start is the over-run protocol. Who flags an emerging over-run, how early, against what threshold? Who approves the additional expenditure — the buyer alone, the buyer with architect consultation, or a defined committee? What happens if the buyer cannot fund the additional expenditure — does the building stop, does a scope reduction trigger, does the contractor carry the over-run? Is the architect's supervision fee fixed (no incentive for over-runs) or percentage-based (small incentive for over-runs)?
The studio that has a clear over-run protocol writes it into the contract. The studio that does not has the awkward conversation in month fifteen of an eighteen-month build, when the awkward conversation is harder to have. Our architect-fees blog covers the fee-structure choice in detail.
The ten questions are not adversarial. They are diagnostic. The studio that can answer them quickly and specifically is the studio you want. The studio that gets defensive or vague is the studio that has not run a project of your specific shape before, or has and learned the wrong lessons. Our architect-in-Dehradun page answers each of these for our studio in our published materials.
Mrs. Tulika Sharma, Senior Designer · Mr. Hitesh Sharma, Business Head · Dios Design, Rajpur Road, Dehradun. If you would like to use this checklist on a conversation with us, the answers to all ten are written into our standard engagement letter. WhatsApp +91 84334 28590.
Frequently asked questions
What is the first question to ask an architect in Dehradun?
Who, in the studio, will actually draw my plan and walk my site? In a small studio the answer is the principal architect. In a larger one it can be a junior on the floor with the principal reviewing periodically. The two arrangements deliver different buildings, charge different fees in effect even if the published number is the same, and produce different outcomes when the project hits a difficult decision. The buyer should know which arrangement applies to their specific commission, in writing.
Is the architect I am about to hire registered with the Council of Architecture?
The Council of Architecture (COA) is the statutory body that registers practising architects in India. A "registered architect" can sign and stamp drawings; a "designer" or "plan designer" or "draftsman" cannot. For an MDDA submission, the architect-of-record stamp has to come from a COA-registered architect. Ask for the registration number and verify it on the COA website if you want certainty. This is a five-minute check that prevents a substantive class of problems.
Should the structural set reference BIS 2025 explicitly?
Yes. The IS 1893 Part 1 of 2025 amendment is the current applicable seismic code for residential structural design in Uttarakhand. A structural set issued in 2026 that references the older 2016 code is a set designed to a superseded standard. The drawings should reference IS 1893:2025 and IS 13920 on the title block, and the structural engineer should be able to explain what changed under the new code if asked.
Who owns the drawings after the project is complete?
Under conventional architectural practice in India, the architect retains copyright in the drawings and licences the buyer to use them for the specific project on which they were commissioned. The buyer cannot reuse the drawings for a different project or sell them to a third party. The architect cannot use the drawings on a different project for a different client either. Both restrictions matter; both should be explicit in the contract.
What happens when the project goes over budget?
It will. Construction projects in Dehradun routinely exceed the original budget by 8 to 18 percent for residential, more on complex hill projects. The conversation to have at the start is what the over-run protocol is: who flags it, who approves the additional expenditure, what happens if the buyer cannot fund the additional expenditure, and whether the architect's supervision fee is fixed or percentage-based (a percentage-based fee creates a small incentive for cost over-runs that a fixed fee does not).
Will the architect personally walk my site, or will a junior do it?
On a small principal-led studio, the principal walks the site. On a larger studio, the senior partner walks the site occasionally and a junior or project architect walks it weekly. Ask which arrangement applies to your project. Ask how often. Ask who attends the contractor coordination meetings. These details rarely appear in the marketing copy and they decide the quality of the build.